Tuesday, April 17, 2012 5-7pm
Saturday, April 21, 2012 9-11am
Sunday, April 29, 2012 9-11am

The 2012 Sutro Reservoir upgrades includes rehabilitation and seismic work on the 50 year old reservoir which is estimated to begin in June 2012 and completed in June 2014. Under this project the reservoir will be upgraded to meet current seismic standards and conform to all State Health requirements. The work to be carried out will include: embankment and erosion work; inlet piping; concrete repair on the interior soffit, beams, columns, cleaning the reservoir, disposal of sediment and final cleaning; repairing the liner; seal cold joints, coat and repair the roof concrete, new inlet structures with buried concrete vaults and automated valves; new expansion joints; block off perimeter vents; installing a new access hatch; new perimeter security fencing; liner repair; new locking systems on reservoir doors; sampling and disinfection facilities; tree removal; perimeter path repaving; hazardous soil management; and seismic upgrade.
Contact: Lolita Sweet, LSweet@sfwater.org
No comments:
Post a Comment